BS EN ISO 10079-3-1993 医疗吸引设备.真空或压力吸引设备

作者:标准资料网 时间:2024-05-20 11:20:57   浏览:8749   来源:标准资料网
下载地址: 点击此处下载
【英文标准名称】:Medicalsuctionequipment.Suctionequipmentpoweredfromvacuumorpressuresource
【原文标准名称】:医疗吸引设备.真空或压力吸引设备
【标准号】:BSENISO10079-3-1993
【标准状态】:作废
【国别】:英国
【发布日期】:1993-02-15
【实施或试行日期】:1993-02-15
【发布单位】:英国标准学会(BSI)
【起草单位】:
【标准类型】:()
【标准水平】:()
【中文主题词】:
【英文主题词】:
【摘要】:
【中国标准分类号】:C46
【国际标准分类号】:11_140
【页数】:30P;A4
【正文语种】:英语


下载地址: 点击此处下载
基本信息
标准名称:用于流体传动和一般用途的金属管接头 O形圈平面密封接头
英文名称:Metallic tube connections for fluid power and general use—O-ring face seal fittings
中标分类: 机械 >> 通用零部件 >> 管路附件
ICS分类:
替代情况:JB/T 966-1977 JB/T 967~969-1967 JB/T 970~975-1977 JB/T 977-1977 JB/T 981-1977 JB/T 984-1977 JB/T 9
发布部门:全国管路附件标委会
发布日期:2005-05-24
实施日期:2005-11-01
首发日期:1900-01-01
作废日期:1900-01-01
提出单位:中国机械工业联合会
归口单位:全国管路附件标委会
起草单位:机械科学研究院、宁波永华液压器材有限公司
起草人:李俊英、李维荣等
出版社:机械工业出版社
出版日期:2005-10-08
页数:29 页
批文号:发改委2005-24
书号:15111.7679
适用范围

本标准规定了管子外径为6mm~50mm钢制O形圈平面密封接头的结构型式及基本尺寸、性能和试验要求、标志等。

前言

没有内容

目录

没有内容

引用标准

没有内容

所属分类: 机械 通用零部件 管路附件
Product Code:SAE J1939/81
Title:Network Management
Issuing Committee:Truck Bus Control And Communications Network Committee
Scope: These SAE Recommended Practices are intended for light and heavy duty vehicles used on or off road as well as appropriate stationary applications which use vehicle derived components (e. g. generator sets). Vehicles of interest include, but are not limited to on and off highway trucks and their trailers; construction equipment; and agricultural equipment and implements.The purpose of these documents is to provide an open interconnect system for electronic systems. It is the intention of these documents to allow Electronic Control Units to communicate with each other by providing a standard architecture.Network management in the SAE J1939 network is concerned with the management of source addresses and the association of those addresses with an actual function and with the detection and reporting of network related errors. Due to the nature of management of source addresses, network management also specifies initialization processes, requirements for reaction to brief power outages and minimum requirements for ECUs on the network.